1. Clean up the materials in the mixer in time after stopping the machine, and release the materials in the final silo in time. The valve of the cement tank is closed and the powder in the two spirals of the cement is emptied. In order to avoid prolonged downtime and wet gambling spiral.
2. Tighten the blades of the mixer and add oil to the bearings. Remove the sticky materials on the belt rollers, and clean up the materials scattered on the ground by the belt in time.
3. In rainy weather, pay attention to whether there is water around the control cabinet, and promptly remove the water around the electrical control cabinet and the water around the motors of the equipment.
4. The motor, reducer, air compressor, vibrator, etc. should be covered in rain to prevent rain.
5. The whole machine is generally painted once a year, and the whole machine oil is generally changed once a year. The reducer is generally replaced every six months.
6. Frequently check the belt rollers, and if there is a problem of unsmooth rotation, it should be refueled and repaired in time. Refer to the equipment manual for the lubrication time and the type of oil added.
7. It is strictly forbidden to add gear oil in the electric drum when changing the oil. Because gear oil will corrode the enameled wire of the motor. Generally, No. 46 mechanical oil is added. Or ordinary bulk oil. Diesel engine oil or transformer oil is also available. Generally this kind of oil is relatively thin. Good insulation performance. Good heat dissipation.