Henan EP Machinery Co.,Ltd

enLanguage

How to prevent heat stroke in the operation of concrete batching plant in summer

Nov 08, 2021 Leave a message

Starting from summer, as the weather gets hotter and hotter. Many concrete batching plant companies are still engaged in production and manufacturing. How to prevent heat stroke is a problem that every production company must face in the summer

 

Since the establishment of the factory, we have always attached great importance to the safety of production workers. Prevention of heat stroke is one of them. When summer is approaching, please assign a specialist to overhaul the indoor air conditioners in each office. If they cannot be cooled properly, please replace them in time. For the production workers of the concrete mixing plant in the workshop, we have done more work. .

1. Adjust the commuting time and try to avoid the high temperature period.

 

The working time in the morning was changed from 8 am to 7 am, and the rest time in the afternoon was changed to 5:30, so as to avoid the excitement of the sun from 10 to 5 o'clock. Avoid workers in the production workshop of the concrete mixing plant from walking on the road under high temperature.

 

2. Sufficient water supply every day, each production worker always maintains two liters of water every day

 

Since the beginning of the summer high temperature period, a person has been assigned to lead the workers to fetch water every day to ensure that each worker receives at least 2 liters of water, and the safety quality inspector will instruct workers in the concrete mixing plant production workshop to drink water every hour not to wait until their mouths When it's done, I'm not busy with work and ignore drinking.


3. The menu of the canteen is changed to be lighter, and everyone will receive a certain amount of fruit every day


At this stage, the main vegetables in the canteen’s menu are tomatoes, cucumbers and so on in the JS3000 concrete mixer. , And each person provides a certain amount of fruit. Supplement the nutrition and moisture of production workers. In addition, it is recommended that qualified production units provide a certain amount of dairy products every day. Can better achieve the effect of heatstroke prevention and cooling.

 

4. The noon break is extended to ensure adequate sleep for production workers.

 

The noon break time was extended from the original one and a half hours to two and a half hours, ensuring sleep and rest time for each employee.

 

Don't underestimate heatstroke. The heatstroke prevention work is not well done. After heatstroke, workers will lose a lot of labor, which is likely to cause products to stop production, unable to deliver goods, and final orders will cause serious economic losses. Take care of every employee in your own factory. As long as they are alive, the factory can flourish