How to do quality control of asphalt batch mixing plant?

Feb 01, 2021 Leave a message

In asphalt batch mixing plant production, you may be facing these problems: The equipment production capacity is insufficient, the actual production capacity is far below the equipment specification capacity, resulting in equipment waste and low efficiency. The main reasons for these failures are as follows: 

01

1. Improper mixing ratio of asphalt concrete

 

Asphalt concrete mix ratio is divided into target mix ratio and production mix ratio. The target mix ratio controls the conveying ratio of sand and aggregate materials. The production mix ratio is the mixing ratio of various sand and stone materials in the finished asphalt concrete material specified in the design. The production mix ratio is determined by the laboratory, which directly determines the grading standard for the finished asphalt concrete. The target mix ratio is set to further guarantee the production mix ratio, which can be adjusted appropriately during production according to actual conditions. When the target mix ratio or production mix ratio is not appropriate, the stones stored in each metering of the mixing station will be out of proportion. Some overflow and some other materials cannot be weighed in time, and the mixing tank is idling, which reduces the output. 

01

2. Unqualified sand and stone grading

Each specification of sand and stone has a grading range. The feeding control is not strict, and the grading is seriously beyond the range, a large amount of "waste" will be generated, and the metering warehouse cannot be measured in time. Not only causes low output, but also wastes a lot of raw materials.

 

3. Low fuel burn value

Asphalt batch mixing plants have certain requirements for combustion oil, generally burning diesel, heavy diesel or heavy oil. During construction, sometimes mixed oil is burned. This oil has low combustion value and less heat, which seriously affects the heating of the drying ability.

 

 

4. Improper setting of equipment operating parameters

Mainly reflected in the improper setting of dry mixing and wet mixing time and improper adjustment of the opening and closing time of the bucket door.

Under normal circumstances, each mixing production cycle is 30-45s, which just reaches the rated production capacity of the equipment. Take the 2000 type equipment as an example, the mixing cycle is 45s, the hourly output Q = 2×3600/ 45= 160 t/h, if the mixing cycle time is 50s, the hourly output Q = 2×3600/50= 144 t/h ( Note: The 2000 type mixing equipment has a rated capacity of 160 t/h) This requires that the mixing cycle time be shortened as much as possible under the premise of ensuring quality.