| Equipment | |
Equipment management, we all know that the material of concrete is made of cement, sand and gravel, silica fume, chemical reagents, water, coal powder, etc. in a certain proportion. These raw materials are relatively hard, and the equipment will be worn for a long time. Therefore, the equipment needs to be maintained and repaired regularly. |
| Driver management | |
For driver management, some mixing plants have their own mixing fleet and equipment. Therefore, it is necessary to manage and track the transportation work of drivers on a daily basis. Ensure that the driver transports the concrete to the construction site on time in strict accordance with the needs of the construction party during transportation. |
| Production scheduling | |
When the production department issues a production plan, it needs to coordinate the laboratory to formulate a mix ratio as soon as possible, and at the same time, coordinate with the dispatch center to arrange vehicle loading, transportation, and unloading. All links are linked together. |
| Internal process management | |
The entire process from the production department to get the order, to the production plan, the proportioning, the production of concrete, and the scheduling of vehicles in a row should be smoothed to avoid delays in the project period due to process problems. |
| Risk prevention | |
That is, proportioning quality prevention, concrete transportation prevention, traffic accident prevention, and financial risk prevention. |