1. When the mixer truck is unloading, it must first rotate forward for 30-60 seconds, and then reverse the unloading to avoid segregation.
2. When the mixer truck is waiting for unloading at the construction site, the mixing tank should still be kept in normal operation to reduce the loss of slump.
3. Under any circumstances, it is strictly forbidden to add water without permission.
If the construction personnel take measures to add water, they should stop them and report to the production scheduling department immediately.
4. At the end of feeding, the vehicle and the inside and outside of the tank must be washed with water. It is not allowed to leave standing water.