Preparation before operation of diesel concrete mixer
1. Check whether the machine is stable and whether the four outriggers are supported firmly;
2. The machine is running normally when empty;
3. Fill the pump with water and test the pump once;
4. Check the electrical grounding condition.

Requirements for diesel concrete mixer after operation
1. A certain amount of stones and water should be put in before shutdown, stirred for 5-10 minutes, and then released to eliminate the accumulation in the cylinder and avoid sticking to the tank;
2. Clean the ash and adhering concrete;
3. Place the hopper in the transport position and hang the safety chain; the operating handle is locked with a safety hook;
4. Cut off the power supply and lock the electrical box;
5. In the freezing season, all the water in the water supply system should be drained;
6. Fill each lubricating point with necessary lubricating oil.
Details introduction
Model | YHZM25 | YHZM35 | YHZM75 | YHZM100 |
Theoretical capacity | 25 | 35 | 75 | 100 |
Concrete mixer | JZM500 | Jzm750 | JZM1500 | JZM2000 |
Aggregate feeding mode | Belt type | Belt type | Belt type | Belt type |
Aggregate batching machine | PLD800 | PLD1200 | PLD2400 | PLD3200 |
Max aggregate diameter(mm) | 60/80 | 60/80 | 60/80 | 60/80 |
Discharge height(m) | 1.1 | 1.3 | 1.3 | 1.3 |
Cement weighing accuracy(%) | ±1 | ±1 | ±1 | ±1 |
Water additive&weighing accuracy(%) | ±1 | ±1 | ±1 | ±1 |
Aggregate weighing accuracy(%) | ±2 | ±2 | ±2 | ±2 |
Total weight (T) | 12 | 13 | 16 | 26 |
Total power(kw)) | 42 | 46 | 67.5 | 77.5 |
Delivery pictures


Hot Tags: portable concrete mixing plant, China portable concrete mixing plant suppliers, manufacturers, self loading concrete machine,








